Sunday, September 29, 2013

Days 19-22

Another busy and productive week of our kitchen renovation has passed, and I'm thrilled to announce that it was the LAST full week of renovating!  Next week will be just a few last finishing touches here and there, but the construction, dust, heavy appliance and granite lifting (not done by me or Tony, of course), and installation aspects of our renovation are all pretty much complete = hooray!!  Here's how the week went down:

On Day 19, our brick work was completed.  You can see that the area on top--to the left of the window--was the last bit that needed to be done. (In this picture, it's drying.) You can barely tell that a door used to be next to the window...and that the window used to be much smaller. Really well done!
On Day 20, our GORGEOUS Quartz countertop was installed! We chose Lyra by Silestone because it looks like marble, but is less expensive and infinitely more durable than actual marble...we just can't hurt it!  And we're very excited to finally have a central place in our kitchen for eating, cooking, baking, doing art and homework...you name it!  Isn't it amazing?!
Our new barstools from Crate&Barrel (which we scored on sale and with free shipping to our local store!) fit perfectly at the island...and we're pleased to announce that they are super comfy!

Day 21 was arguably the most stressful day of our renovation. The granite guys showed up bright and early that morning, and things started off smoothly. They first brought in our really cool new sink...it's a granite composite sink that's very durable and nonporous.  Sink?  Check!
Then they brought in the first granite slab (of two) and it fit with no problem. First piece of granite? Check!
What happened next was very frustrating. The guys brought in the second slab, but it just wouldn't fit. They estimated that it was only 1/8" too long, but that's all it took since granite does not give. Here are the granite guys using a machine that looks like a defibrillator to try and pull the granite slabs together. Well, it FINALLY fit into place, BUT a chunk of the granite close to the seam chipped off. :-(
Luckily...the guys were able to call the fabricator and order a new one for us. In fact, just a few hours later, the guys returned with our SECOND (1/8" shorter) slab. In an effort to make the installation easier, they cut away some of the dry wall behind the counter AND carved out the cooktop hole on our front lawn. It fit with relatively no problem, BUT wouldn't you know it? The second piece cracked, too. :-( :-(
After strike two, I figured our granite installation would be postponed until the next day at the earliest, but wouldn't you know it? They called the fabricator and ordered our THIRD slab! (I think it's safe to assume that by the third slab, we were no longer working with the granite slab that Tony and I picked out. Oh, well!) This time they cut out the cooktop hole in our kitchen (which is extremely loud and very messy, in case you're wondering), but it worked and the third slab was a winner. :-) So...a job that began at 8:30 a.m. ultimately finished around 9:30 p.m.! That's why these first shots of our Black Pearl granite are pretty dark! But at least we went to bed knowing that our granite was actually installed with no problems, even if the third time's a charm!
On Day 22, we took time to admire our pretty granite in the daylight. The Black Pearl is really perfect for our kitchen...the dark color is a great contrast from our white perimeter cabinets and the rich brown flecks in it bring out the espresso island, rubbed bronze hardware, and taupey walls. It also has some black streaks in it that look like snake skin...can you tell I'm a little smitten??

Day 22 was also a very big day for installations.  We got our range hood, cooktop, convection oven, faucet (over our new sink), pendant lights and even the glass for our cabinets. It was very exciting to see everything come together...particularly because (insert confession) so many of the things we chose and ordered for our kitchen we never saw in person. Call me crazy, but it's kind of fun to take a gamble on something you spot on the internet and see if it works in your home. (The worst thing that happens is you return it!) This includes:
our pendant lights (which look like the pic on the right when not lit up):
and our sink and hardware:

Oh, and our hood:
I was SOOO thrilled to have a gas cooktop again (Tony and I realized that it's been 11 years since we had a gas range--not since our first apartment together in Baltimore!) that I dusted off (literally, thanks to all the demo and granite grinding of late) some pots and pans and whipped up homemade pasta sauce over rigatoni...and steamed green beans!  It wasn't a fancy meal, but it was delicious and seemed lightning fast compared with the little electric cooktop I've been using. 
And then we sat down at the island just the four of us and ate and enjoyed the view...and ate and enjoyed the view. What a great feeling...like eating dinner at a table in our very own private restaurant!! 

So that was our week! Next week, a few more finishing touches will take place and then we'll be calling this reno a wrap (until November when we get our backsplash, which you can tell from the photo above is still missing). Yay!

P.S.  Since we didn't need our old, rolly island anymore, I listed it on Craig's List...and it sold in less than 10 hours! Farewell, dear island!